Renovation of El Cotillo Fishing Dock: A Significant Step for Fuerteventura
Investment and Modernization Goals
The fishing dock at El Cotillo, located in La Oliva, Fuerteventura, is set to undergo a significant transformation with a budget of €200,000. This project aims to renovate over 2,000 square meters of the dock, catering to the modern needs of local fishermen and enhancing the overall functionality of the facility.
Official Initiation of the Project
The renovation officially began when the Ministry of Agriculture, Livestock, Fishing, and Food Sovereignty of the Canary Islands Government signed a replanning act. This act was formalized between the ministry, the public company Gestur Canarias, and the construction entity Obras Públicas Canarias S.L. The signing event was attended by key officials including Narvay Quintero, the regional minister; Lola García, the president of the Fuerteventura Island Council; and various representatives from local fishing and construction sectors.
Addressing Historical Demands
Minister Quintero emphasized that this initiative addresses longstanding demands from the northern fishing sector of Fuerteventura. He acknowledged the need to modernize and refurbish facilities to meet the operational requirements of marine professionals. With an investment of €200,000, the project aims to provide necessary improvements that will significantly impact the local fishing community.
Infrastructure and Community Benefits
Lola García, President of the Fuerteventura Island Council, pointed out that the primary sector in the region faces structural challenges due to double insularity and rising global costs. The renovation of the fishing dock is seen as essential for ensuring the competitiveness of the agricultural, livestock, and fishing industries. It’s a fundamental step toward supporting traditional fishing practices in the area.
The initiative is not just crucial for the fishing community; it reflects the local government’s commitment to preserving and enhancing cultural heritage tied to fishing.
Technical Execution and Safety Measures
Agoney Piñero, the CEO of Gestur Canarias, highlighted that the public entity is dedicated to utilizing its technical and management capabilities to actualize projects that improve public infrastructures. The focus will be on ensuring high-quality execution within the specified timeframe and delivering valuable solutions for both the productive sectors and residents.
During a guided tour of the facilities, Héctor Pérez, the technical director of Gestur Canarias, discussed the gradual deterioration of the fishing dock caused by environmental exposure and the passage of time. This backdrop establishes the urgency and necessity of the current renovations.
Scope of Renovation Work
The renovation works, projected to last for two months, focus on repairing infrastructural damages, enhancing safety, and optimizing conditions for initial sales and handling of fish products. Key aspects of the project include:
-
Comprehensive Repairs: The renovation will involve restoring the breakwater using specialized coatings designed to withstand harsh marine environments.
-
Resurfacing: Approximately 2,000 square meters of the dock will be repaved to improve usability.
-
Fuel Storage Upgrade: The current 5,000-liter fuel storage unit will be replaced with a new 10,000-liter tank that meets modern safety and environmental standards, equipped with necessary protective features.
-
Infrastructure Enhancements: Additionally, the project will include installing new doors on the floating docks, creating a pathway to the fisher’s facilities, and updating signage, furniture, and equipment throughout the site.
Collaborative Government Efforts
In late 2025, the Council of Government approved the declaration of economic urgency to execute a credit expansion aimed at funding these vital infrastructure improvements. This decision resulted from cooperative efforts between the Ministry of Agriculture and the Ministry of Public Works, highlighting a unified approach to support the area’s economic resilience.
As this revolutionary project moves forward, it symbolizes not just physical improvement but a commitment to enhancing the livelihoods and working conditions of the fishing community in Fuerteventura. The community stands to benefit greatly, as does the cultural fabric of life by the sea.

